Services for Engineers:
MEP, FP, and FA
In order to properly acquire optimal operation needs while meeting energy savings, the HVAC design fully considered the usage of high efficiency equipment, as well as the dimensions and selection of equipment. Design of the lab’s fume hood exhaust system.
SQUARE FOOT:
A total of 88,000 square feet is spread over four buildings. The building has labs, conference rooms, and office space.